Kuna Parks and Rec Parking Lot
This project was to rehab an existing parking lot in front of the parks and rec department in downtown Kuna alongside the Kuna Canal. Peak Excavation performed the mass excavation, aggregate import, pavement and concrete prep while Peak Concrete poured the trash enclosure, curb & gutter, and sidewalk. Working with JUB and the City of Kuna went great, as well as Power Plus, and Hazel Asphalt.